Project Name: Construction of a) Ooni Ilare Rd (1.024km), b) Fajuyi – Ajegunle – Igboya Rd (956m) at Ife Central LGA, State of Osun
Project Year: 2013
Project Location: Ife, Ife Central LGA, State of Osun
Project Owners: State Government of Osun, Ministry of Works & Transport, Osogbo, State of Osun
Project Consultants: State Government of Osun, Ministry of Works & Transport, Osogbo, State of Osun
Project Summary: An urban road construction under the State of Osun Local Government Road projects. The road projects included;
1] Ooni Ilare Road
a) construction of lateritic sub-base 200mm,
b) construction of stone-base 150mm,
c) construction of 2024m concrete lined drains,
d) construction of 2 no(s) 600mm ring culverts.
2] Fajuyi – Ajegunle – Igboya Road
a) construction of lateritic sub-base 200mm,
b) construction of stone-base 150mm,
c) construction of 1912m concrete lined drains,
d) construction of 4 no(s) 600mm ring culverts.
Project Name: Construction of Ilesha Baruba – Gbebeberu – Babane Road (36km) at Baruteen LGA, Kwara State
Project Year: 2012
Project Location: Ilesha Baruba, Baruteen LGA, Kwara State
Project Owners: Kwara State Government, Ministry of Works & Transport, Ilorin, Kwara State
Project Consultants: Kwara State Ministry of Works & Transport, Ilorin, Kwara State
Project Summary: A rural road construction under the Kwara State Rural Roads projects. The 36km road project included;
a) construction of RN/DRP stabilized lateritic sub-base 150mm,
b) construction of RN/DRP stabilized lateritic base 150mm,
c) construction of 2 no(s) box culvert,
d) construction of 9 no(s) 600mm ring culverts.
Project Name: Construction of Zambufu – Bishewa Road (8km) at Edu LGA, Kwara State
Project Year: 2012
Project Location: Bushewa, Edu LGA, Kwara State
Project Owners: Kwara State Government, Ministry of Works & Transport, Ilorin, Kwara State
Project Consultants: Kwara State Ministry of Works & Transport, Ilorin, Kwara State
Project Summary: A rural road construction under the Kwara State Rural Roads projects. The 8km road project included;
a) construction of RN/DRP stabilized lateritic sub-base 150mm,
b) construction of RN/DRP stabilized lateritic base 150mm,
c) construction of 2 no(s) box culvert,
d) construction of 3 no(s) 600mm ring culverts.
Project Name: Construction of Lafiagi – Chewuru Road (10km) at Edu LGA, Kwara State
Project Year: 2012
Project Location: Lafiagi, Edu LGA, Kwara State
Project Owners: Kwara State Government, Ministry of Works & Transport, Ilorin, Kwara State
Project Consultants: Kwara State Ministry of Works & Transport, Ilorin, Kwara State
Project Summary: A rural road construction under the Kwara State Rural Roads projects. The 10km road project included;
a) construction of RN/DRP stabilized lateritic sub-base 150mm,
b) construction of RN/DRP stabilized lateritic base 150mm ,
c) construction of 4 no(s) 600mm ring culverts.
Project Name: Construction of Ndeji – Patikesan Road (10km) at Edu LGA, Kwara State
Project Year: 2012
Project Location: Ndeji, Edu LGA, Kwara State
Project Owners: Kwara State Government, Ministry of Works & Transport, Ilorin, Kwara State
Project Consultants: Kwara State Ministry of Works & Transport, Ilorin, Kwara State
Project Summary: A rural road construction under the Kwara State Rural Roads projects. The 10km road project included;
a) construction of RN/DRP stabilized lateritic sub-base 150mm,
b) construction of RN/DRP stabilized lateritic base 150mm,
c) construction of 4 no(s) box culverts,
d) construction of 2 no(s) 600mm ring culverts.
Project Name: Rehabilitation/Construction of 15.8km Ido – Ipere – Iludun Road at Ido LGA, Ekiti State
Project Year: 2008
Project Location: Ido Ekiti; Ekiti State
Project Owners: Ekiti State Government, Ministry of Works & Infrastructure, Ajilosun, Ado-Ekiti
Project Consultant: Garibs/Emfem/ Associates
Project Summary: A rehabilitation/construction of 15.8km of Trunk A road which included the following works;
a) chemical soil stabilization(RN/DRP) of sub-base coarse (150mm),
b) chemical soil stabilization(RN/DRP) of base coarse (150mm),
c) asphaltic wearing coarse (30mm),
d) construction of 4 no(s) access box culvert(varing sizes),
e) construction of 4 no(s) access box culverts(extensions),
f) construction of 5 no(s) 600mm access ring culverts,
g) construction of 2000m concrete lined drains.
Project Name: Construction of 4.2hectare Cargo Apron at Murtala Mohammed International Airport, Lagos
Project Year: 2007
Project Location: Murtala Mohammed International Airport; Cargo Zone
Project Owners: Federal Airport Authority of Nigeria
Project Consultants: Olubowale and Associates
Project Summary: An expansion/construction of the cargo apron at the Murtala Mohammed International Airport which included; a) cement/soil stabilization of sub-base coarse (200mm),
b) stone-base coarse (150mm),
c) concrete finish with expansion joint (300mm),
d) construction of access culvert adjoining taxiway,
e) construction of 380m concrete lined drain,
f) construction of fuel hydrant points,
g) construction of lighting towers.
Project Name: Construction of Permanent Site at College of Education, Lanlate
Project Year: 2006
Project Location: Lanlate Campus, Lanlate, Oyo State
Project Owners: Emmanuel Alayande College of Education, Oyo, Oyo State
Project Consultants: Works Department, Emmanuel Alayande College of Education, Oyo
Project Summary: Construction of School of Arts(100m2) and Central Library complex(1200m2) at the Lanlate Campus. The project consists of a) reinforced concrete columns with blocked walls, wood pannelled doors, lourved windows, and 45ga aluminium roof sheets.